Ticket #877 (closed assessed: not an issue)
MPA Optimization Area closed not working
Reported by: | joeb | Owned by: | |
---|---|---|---|
Priority: | normal | Milestone: | Ecopath 6: release 6.2 |
Component: | Ecospace | Version: | |
Severity: | major | Keywords: | |
Cc: |
Description (last modified by jeroens) (diff)
When running the MPA optimization under the Importance layer mode it seems the the Area closed (min %) and Area close (max %) are not used
- Load the MPA optimization form.
- Set the Search type to Importance layer.
- Make sure there is some kind of an MPA loaded.
- set Area closed min and max, 5-50.
- set Step % 5.
- Iteration 5, make this a small enough number that you can wait for it to run, you can also set the Ecospace run length to something smaller so it runs faster.
- Run it and wait for the output.
- In the Map input tab you can see the iteration, as the Area size changes you should be able to tell by the number of MPA cells on the map.
- From the Results tab you should be able to select the different Area closed(%) for output but it does not seem to work only the default of 20% is available.
Change History
Note: See
TracTickets for help on using
tickets.