Ticket #870 (closed assessed: fixed)
Flow diagram differences between EwE5 and EwE6
Reported by: | hectorp | Owned by: | jeroens |
---|---|---|---|
Priority: | normal | Milestone: | Ecopath 6: release 6.2 |
Component: | Ecopath | Version: | |
Severity: | minor | Keywords: | flow diagram |
Cc: |
Description
If you try to build .. (generic 37 for example) in Ewe 6, the level position of each group in the flow diagram (built with EwE5.0) will be different than the data results in the table basic estimates. Maybe is a problem of the software between the flow diagram EwE 5 and the reading of the data from EwE6.
Change History
comment:2 Changed 14 years ago by jeroens
Test 1: generating a flow diagram in EwE5 and EwE6 on a US system yields identical results
Note: See
TracTickets for help on using
tickets.
Hector is using a system with commas for decimal separators