Ticket #511 (closed not assessed: not an issue)

Opened 16 years ago

Last modified 14 years ago

Forcing Function beneath the NA indice plot as in EwE5

Reported by: joeh Owned by: sheilah
Priority: low Milestone: Ecopath 6: release 6.0.8
Component: Ecopath Version:
Severity: feature Keywords:
Cc:

Description

Add Forcing Function beneath the NA indice. A low priority request from Shiela.

Attachments

NA_docklayout.JPG (163.3 KB) - added by jeroens 14 years ago.
Network Analysis with Effort panel docked below

Change History

comment:1 Changed 16 years ago by shermanl

JoeH,

This is a low priority indeed. The issue you will face is that the forcing function sketchpad will not be accessible in the plugin. The fix: plot the forcing function in zedgraph and make the background slightly gray to show the user that it is not editable.

comment:2 Changed 15 years ago by jeroens

Sherm, this one still belonged to Joe H.
Please re-assign or fix it in a lost moment ;)

comment:3 Changed 15 years ago by jeroens

I can move the sketch pad classes to ScInt? Shared. Let me invest 5 mins to see how much work that would be.

comment:4 Changed 14 years ago by jeroens

  • Milestone changed from Ecopath 6 to Ecopath 6 TODO

In EwE5, the run Ecosim form is capable of displaying Network Analysis indicators. This works fundamentally different in EwE6. We *could* add display of Fishing Effort under the Network Analysis Indices graph in a collapsible split panel.

Good news: while this issue was pending, the shape sketchpad migrated into ScInt? shared. The technical challenge here is minor.

However, is this change really wanted?

comment:5 Changed 14 years ago by sunk

  • Type set to not assessed

comment:6 Changed 14 years ago by shermanl

  • Owner shermanl deleted
  • Status changed from new to assigned

comment:7 Changed 14 years ago by jeroens

  • Owner set to shermanl

Please OK or discard this

comment:8 Changed 14 years ago by jeroens

  • Owner changed from shermanl to sheilah

Please, allow me be opinionated here.

  • In EwE5 the Network Analysis indices were displayed in the Run Ecosim form.
  • In EwE6, Network Analysis has its form with inputs and outputs. The tight connection between Network Analysis and Ecosim was removed simply because Network Analysis was developed as a plug-in.

We could emulate the EwE5 layout by repeating the Effort interface under the Network Analysis form, but why not use the current capabilities of EwE6? We have this wonderful capability to reorder the screen and to dock forms wherever we please. This allows users to set up a screen any way they like (see attached image)

As far as I can see, the current layout allows users to approximate the EwE5 feel, but also to do very different things. This could mean that this change request is obsolete. What do you think, Sheila?

Changed 14 years ago by jeroens

Network Analysis with Effort panel docked below

comment:9 Changed 14 years ago by jeroens

  • Status changed from assigned to closed
  • Resolution changed from open to not an issue
Note: See TracTickets for help on using tickets.