Ticket #1375 (closed not assessed: fixed)
Monte Carlo not varying B unless driven by time series
Reported by: | szymons | Owned by: | joeb |
---|---|---|---|
Priority: | normal | Milestone: | |
Component: | Monte Carlo | Version: | 6.4.3 |
Severity: | NOT SET | Keywords: | |
Cc: |
Description
I have encountered some issues with the Monte Carlo routine in EwE (version 6.4.3). Just like the previous time, all 20 trials returned final B values identical to those in the Ecopath model, except for the groups that were driven with time series.
I managed to avoid this problem somehow when I was using MC last spring, but it seems to have resurfaced. It looks to me like the MC routine as currently written is still not 100% reliable.
Change History
Note: See
TracTickets for help on using
tickets.
This is a duplicate of #1307