Ticket #1133 (closed assessed: fixed)

Opened 12 years ago

Last modified 11 years ago

Network analysis [appears to] hang[s]

Reported by: maciejt Owned by:
Priority: normal Milestone: Ecopath 6: release 6.4 BETA
Component: Network Analysis plug-in Version: 6.3.1
Severity: major Keywords:
Cc:

Description

EwE freezes when network analysis executes

Change History

comment:1 Changed 12 years ago by jeroens

  • Severity changed from block to minor

Similar reports have come from other users.

Network Analysis does not crash, but may take a *very* long time to complete if diet matrices are complex with many loops and sub-loops. For some models it may take ENA an hour to complete, in other models this may take several hours.

The application does not crash.

However, two issues need addressing:

  • The user interface freezes while ENA is running which needs an option to be interrupted.
  • Ecosim invokes the lengthy computations for every time step. This needs addressing.

We should look into using multi-threading and using multiple processors to speed up the calculations

comment:2 Changed 12 years ago by jeroens

  • Severity changed from minor to major

comment:3 Changed 12 years ago by jeroens

  • Summary changed from Network analysis hangs to Network analysis [appears to] hang[s]

comment:4 Changed 11 years ago by joeb

To test the speed gain by just looping over the links we can put a stopwacth in the loops to test time spent in groups that have no pred/prey link

comment:5 Changed 11 years ago by jeroens

Implemented partial solution by showing slow run time warning

comment:6 Changed 11 years ago by jeroens

  • Status changed from new to closed
  • Version set to 6.3.1
  • Resolution set to fixed
  • Milestone changed from Ecopath 6: release 6.3 BETA to Ecopath 6: next release

Added a configurable time-out for Network Analysis

Note: See TracTickets for help on using tickets.