    v59 v60  
    5050   * '''Annual increase in catchability''' Amount catchability will increase each year. 
    5151 * '''Recruitment:''' [[BR]]''MSE Recruitment form.[[BR]]''[[Image(MSE_Recruit.jpg)]] 
    52  
    53  * Recruitment/total population: Percentage of total population that will recruit. 
    54  * Ratio Bt/Ecopath B for 50% recruitment: Ratio of biomass at time to Ecopath base biomass for 50% of recruitment. 
    55  * Recruitment CV: Coefficient of variation used in the Kalman filter. 
     52   * '''Recruitment/total population''': Percentage of total population that will recruit. 
     53   * '''Ratio Bt/Ecopath B for 50% recruitment''': Ratio of biomass at time to Ecopath base biomass for 50% of recruitment. 
     54   * '''Recruitment CV''': Coefficient of variation used in the Kalman filter. 
    5655 
    5756= Reference levels = 
    58 Sets reference levels lines that appear on plots and as percentage values above and below reference in the MSE Results grid. = 
     57Sets reference levels lines that appear on plots and as percentage values above and below reference in the MSE Results grid.  
    5958 
    6059 * '''Group''' Sets reference levels that appear on group plots and in results grids. 
     
    6867   * '''Effort lower '''Upper effort limit by a fleet. 
    6968   * '''Effort upper''' Upper effort limit by a fleet. 
     69 
     70=  = 
     71=  = 
     72= Output = 
     73 * '''Run MSE''': 
     74   * '''No. of trial''': Number of MSE trials to run. 
     75   * '''Start year''': Years in Ecosim run to start implementation of regulatory rules. 
     76   * '''Display items''': Select which groups to view on the graph. 
     77 * '''MSE plots''': View output plots from the last MSE run. 
     78   * '''Plot type''': Select how the data is to be plotted. 
     79     * '''Histogram''': Draws a histogram for the selected plot. 
     80     * '''Values''': Draws a time series graph for the selected plot. 
     81   * '''Plots''': Select the data to be plotted. 
     82   * '''Group Biomass:''' Biomass for the selected groups. 
     83   * '''Group catch: '''Catch for the selected groups 
     84   * '''B estimated/B:''' Biomass estimated by the stock assessment model / Biomass predicted by Ecosim for the current time step. 
     85   * '''Value total:''' Sum of catch value for all groups. 
     86   * '''Sensitivity of F target:''' Linear programming dual or shadow variable. The dual values or reduced costs values indicate that the objective function will change with the value of the reduced cost if the restriction is changed with 1 unit.  
     87   * '''Fleet Value:''' 
     88   * '''Fleet effort:''' 
     89 
     90 
     91 
     92   
    7093 
    7194=  =