id,summary,reporter,owner,description,type,status,priority,milestone,component,version,severity,resolution,keywords,cc 510,Changing the Ecosim summary Begin year causes crash,joeb,administrator,"Open a model and go to the Ecosim parameters form increase the number of years (80). Run Ecosim then go to the Ecosim results form. Change the begin year and tab or click away from the textbox, the grid should update with the new results. It will either crash or close the Results form. ",,closed,normal,Ecopath 6: build 6.0.7,Overall GUI,,crash,fixed,,