Ticket #38 (closed: fixed)
other production not being calculated
Reported by: | carieh | Owned by: | administrator |
---|---|---|---|
Priority: | normal | Milestone: | Ecopath 6: build 6.0.7 |
Component: | Ecopath | Version: | |
Severity: | major | Keywords: | |
Cc: |
Description
Parameterization/ biomass accumulation
Testing lab 5 from Fish 501, in version 5 for the macroalgae group: Biomass, PB, and EE were entered for this group. IN version 5 there is a diolouge box prompting if you would like to estimate biomass accumulation. In version 6 no such thing occurs. Consequently you end up with different EE's in the 2 cases. Version 5 the EE was inputted as 1.0, and remains this way (but allows for biomass accumulation) In version 6.0.3 the EE increases to 1.2, and there is no mention of biomass accumulation. Biomass accumulation does not show up in the other production tab of version 6.0.3
Change History
Note: See
TracTickets for help on using
tickets.
As of July 27th this is not fixed.
Model: lab 5 july 27, there should be some biomass accumulation for macroalgae, as the EE was set to 1. In version 5 the accumulation is calculated, and you are asked when you balance the model. In version 6 there is no such question or notification, as well as the fact that instead of the EE remaining at 1, it is changed in the parameterization to 1.2.
Basically this is the same thing that happened before