Ticket #1029 (closed assessed: fixed)

Opened 13 years ago

Last modified 13 years ago

Ecosim Forcing Function do not save data past 100 years

Reported by: joeb Owned by:
Priority: normal Milestone: Ecopath 6: release 6.3 BETA
Component: Ecosim Version:
Severity: minor Keywords:
Cc:

Description

Set the Ecosim run length to greater than 100 years.

Sketch in Forcing Function data from 100 to your new run length.

Save, Close and Re-open the model. If the Ecosim run length was greater than 100 years when you saved the Forcing Function data will be preserved. If the Ecosim run length was less than 100 year when you saved the Forcing Function data greater than 100 years will be lost.

Change History

comment:1 Changed 13 years ago by jeroens

Shapes save and reload at a minimum of 100 years, even if the Ecosim run length is less than 100. This is confusing; shapes should save to either their max number of data points regardless of run length, or to the actual run length. The current in-between solution is confusing.

Last edited 13 years ago by jeroens (previous) (diff)

comment:2 Changed 13 years ago by jeroens

  • Status changed from new to closed
  • Resolution set to fixed

Solved by remembering, saving and reloading data for the longest run time ever used, starting at 100 years. This setting may require a user interface to control the amount of data that is saved.

Note: See TracTickets for help on using tickets.